| Level 3TM Overview |
| |
 |
|
Modern data centre facility situated in Southeast of Dusseldorf |
 |
|
Operational since November 2000 |
 |
|
Technical space arranged over two floors |
 |
|
Total size (technical space): 6,863 m2 |
 |
|
Available fully fitted space: 1,866 m2 |
 |
|
Available "Shell and Core" space: 1,484 m2 |
 |
|
Carrier connectivity: Level 3TM, COLT, DTag, ISIS, Wingas, Versatel |
| |
| Technical Summary |
| |
| Mains Power |
| |
 |
|
4MVA (6 ultimate) supply via dedicated underground 10kV cable feeds |
| |
|
to dedicated 2 x 2MVA (3 x 2MVA ultimate) 10kV/400V transformer |
| |
|
substation |
| |
| Generators |
| |
 |
|
One (two ultimate) x 2.5MVA diesel-driven emergency power |
| |
|
generators giving 2.5 MVA (5MVA ultimate) |
 |
|
Automatic start in less than one minute to feed 100% of the facility |
 |
|
Generators tested monthly |
 |
|
Fuel storage (Diesel) for 24-hour continuous operation at 100% load |
 |
|
24 x 7 agreement with local fuel supplier |
| |
| UPS |
| |
 |
|
2 x 500kVA (additional 4 x 625 kVA possible) Hybrid Rotary UPS |
| |
|
modules providing 500kVA total output with N+1 redundancy |
 |
|
15-minute battery autonomy per UPS module |
 |
|
Dual redundant A and B distribution strategy |
 |
|
Underfloor power track distribution system |
| |
| DC |
| |
 |
|
48VDC power system. 400A "A" + 400A "B" expandable to 2385A "A" |
| |
|
+ 2385A "B" |
 |
|
Dual-redundant "A" and "B" systems with dual redundant "A" and "B" |
| |
|
distribution |
 |
|
Four hours of battery autonomy |
 |
|
Underfloor direct A and B feeds from PDU to fuse panel |
| |
| Environment |
| |
 |
|
750W/m2 average cooling capability over the gross space |
 |
|
Temperature regulated overall to 21°C ± 2°C |
 |
|
Humidity regulated overall to 50%RH ± 10% |
 |
|
Technical areas positively pressurized to minimize dust ingress |
| |
| Physical |
| |
 |
|
Minimum floor-to-ceiling height: 3,700mm from top of raised floor |
 |
|
650mm raised floor height |
 |
|
Raised Floor Loading: 12kN/m2 |
 |
|
Structural Floor Slab: |
| |
|
Ground floor - 25kN/m2 |
| |
|
First/Second Floors - 10kN/m2 |
| |
| Fire Strategy |
| |
 |
|
Use of non-inflammable and low-smoke zero halogen materials where |
| |
|
possible |
 |
|
No storage (especially of flammable materials) within technical space |
 |
|
Building split into sealed, independent, fire compartments |
 |
|
Very Intelligent Early Warning (V.I.E.W.) detection above and below |
| |
|
raised floor |
 |
|
Smoke extract system activated by fire alarm |
 |
|
Double-interlocked pre-action dry pipe sprinkler system |
| |
| Security |
| |
 |
|
Remote security monitoring 24 x 7 |
 |
|
Full electronic access control system, based on Proximity cards with |
| |
|
photo and PIN keypads |
 |
|
Biometric Palm-scanners for Colocation area |
 |
|
Intruder-detection system on escape and riser doors |
| |
| Closed Circuit Television (CCTV) |
| |
 |
|
CCTV monitoring and recording of all access points and circulation |
| |
|
areas |
| |
| Building Monitoring System (BMS) |
| |
 |
|
Local Operations and Control Centre |
 |
|
Network monitoring system with critical alarm repeating to Regional |
| |
|
Management Centre |
 |
|
24 x 7 local monitoring and logging of temperature and humidity |
| |
|
conditions and alarms |
 |
|
Full perimeter under-floor leak detection linked to building monitoring |
| |
|
system |
| |
| Telecom Infrastructure |
| |
 |
|
Facility is designed to accommodate standard rack/cabinets of |
| |
|
2,200mm nominal height |
 |
|
Power is normally distributed under floor; fibre and copper cabling |
| |
|
distributed overhead (fibre within a managed containment system, |
| |
|
copper within a heavy-duty ladder rack system) |
 |
|
Fibre entry to the building is via two independent points |
| |
| General Facilities |
| |
 |
|
Dedicated loading area - delivery hours 08.00 - 18.00 (Mon. to Fri.) |
 |
|
Customer test room and kitchen (90m2) |
 |
|
Goods lift - 1.15m wide x 2.5m high (maximum load 1,350 kg) |
| |