| Level 3TM Overview |
| |
 |
|
Modern data centre facilty situated in the south of Berlin, close to |
| |
|
Berlin-Tempelhof airport |
 |
|
Operational since October 2000 |
 |
|
Technical space arranged over two floors |
 |
|
Total size (technical space): 7,744 m2 |
 |
|
Available fully fitted space: 2,852 m2 |
 |
|
Maximum site power: 8 MVA |
 |
|
Carrier connectivity: Level 3TM,Colt, DTag, Versatel, QSC |
| |
| Technical Summary |
| |
| Mains Power |
| |
 |
|
Dedicated underground 10kV cable feeds to 3 x 2MVA, (4 x 2 MVA |
| |
|
ultimate) 10kV/400V transformer substation |
| |
| Generators |
| |
 |
|
One (three ultimate) x 2MVA diesel-driven emergency power |
| |
|
generators giving 2 MVA (6 MVA ultimate) |
 |
|
Automatic start in less then one minute to feed 100% of the facility |
 |
|
Generators tested monthly |
 |
|
Fuel storage (Diesel) for 24 hour continuous operation at 100% load |
 |
|
24 x 7 agreement with local fuel supplier |
| |
| UPS |
| |
 |
|
Two (three ultimate) x 625kVA Hybrid Rotary UPS modules providing |
| |
|
625kVA (1,250kVA ultimately) total output with N+1 redundancy |
 |
|
15-minute battery autonomy for each UPS module |
 |
|
Dual-redundant A and B distribution strategy |
 |
|
Underfloor power track distribution system |
| |
| DC |
| |
 |
|
48VDC power system. 400A "A" + 400A "B" expandable to 2385A "A" |
| |
|
+ 2385A "B" |
 |
|
Dual-redundant "A" and "B" systems with dual redundant "A" and "B" |
| |
|
distribution |
 |
|
Four hours of battery autonomy |
 |
|
Underfloor direct A and B feeds from PDU to fuse panel |
| |
| Environment |
| |
 |
|
750W/m2 average cooling capability over the gross space |
 |
|
Temperature regulated overall to 21°C +/- 2°C |
 |
|
Humidity regulated overall to 50%RH +/- 10% |
 |
|
Technical areas positively pressurized to minimize dust ingress |
| |
| Physical |
| |
 |
|
Minimum floor-to-ceiling height: 3,100mm from top of raised floor |
 |
|
850mm raised floor height |
 |
|
Raised-floor loading 30kN/m2 |
 |
|
Structural Floor Slab: Ground Floor - 30kN/m2; First Floor - 8kN/m2 |
| |
| Fire Strategy |
| |
 |
|
Use of non-inflammable and low-smoke, zero-halogen materials |
| |
|
where possible |
 |
|
WorldCom Local No storage (especially of flammable materials) within |
| |
|
technical space |
 |
|
Building split into sealed, independent, fire compartments |
 |
|
Very Intelligent Early Warning (V.I.E.W.) detection |
 |
|
Smoke extract system activated by fire alarm |
 |
|
Double-interlocked pre-action dry pipe sprinkler system |
| |
| Security |
| |
 |
|
Remote 24 x 7 security monitoring |
 |
|
Full electronic access control system, based on proximity cards with |
| |
|
photo and PIN keypads |
 |
|
Biometric palm-scanners for colocation areas |
 |
|
Locks on colocation suites and cabinets |
 |
|
Intruder detection system on escape and riser doors |
| |
| Closed Circuit Television (CCTV) |
| |
 |
|
CCTV monitoring and recording of all access points and circulation |
| |
|
areas |
| |
|
|
| Building Monitoring System (BMS) |
| |
|
|
 |
|
Local Operations and Control Centre |
 |
|
Network monitoring system with critical alarm repeating to Regional |
| |
|
Management Centre |
 |
|
24 x 7 local monitoring and logging of temperature and humidity con- |
| |
|
ditions and alarms |
 |
|
Full permiter under-floor leak detection linked to building monitoring |
| |
|
system |
| |
| Telecom Infrastructure |
| |
 |
|
Facility is designed to accommodate standard rack/cabinets of |
| |
|
2,200mm nominal height |
 |
|
Power is normall distributed under-floor; fibre and copper cabling |
| |
|
distributed overhead (fibre within a managed containment system, |
| |
|
copper within a heavy-duty ladder rack system) |
 |
|
Fibre entry to the building via two independent points |
| |
|
|
| General Facilities |
| |
 |
|
Dedicated loading area - delivery hours 8.00-18.00 (Mon to Fri) |
 |
|
Customer test room (68 m2) and storage area (48 m2) |
 |
|
Goods lift - 1.4m wide x 2.6m high (maximum load 2,500kg) |
| |